Project Description: This project, constructing a new landfill facility for the City of Lubbock, included excavating a new existing landfill cell (3,126,600 cu yds), constructing landscape berms around the facility (602,312 cu yds), planting trees and other vegetation, installing a geosynthetic clay liner (621, 440 sq ft), installing smooth (396,768 sq ft) and textured (308,968 sq ft) HDPE liners, installing a geosynthetic drainage layer (679,490 sq ft), installing a 12-inch leachate collection system, installing a protective soil cover (49,577 cu yds), and placing gabion mattresses and various erosion control devices.

We also installed barbed wire and chain link fencing, a drip irrigation system, concrete roads and sur­faces, asphalt paving, corrugated metal culverts, and a pair of truck scales. In addition, we constructed a maintenance building, a de-mudding facility, a gate house, and related appurtenances.